To facilitate the ongoing emergency repair of a gas leak at the junction of Reddown Road, SGN have installed two way temporary lights on Marlpit Lane. I have asked for the signals to be manually controlled between 7.30am to 9.30 and 14.30 to 18.30 to assist with traffic flows. Reddown Road remains closed during this time. The work is expected to be completed by 19th June.
Please follow link for location