Emergency repair work is required to a gas leak resulting in SGN installing multi-way temporary lights on Woodcote Grove Road at its junction with Fairfield Way The lights are to be manually controlled between 7.30 and 9.30 and again between 14.30 and 18.30 because of the traffic sensitivity of the road. The lights will include a pedestrian phase as the existing signalised crossing has been turned off for the duration of the works. The works are expected to be completed by 13th July.