To facilitate urgent sewer works Thames Water have installed two way temporary signals outside 356 Chipstead Valley Road. To minimise delays on the highway the lights will be manually controlled between 7am and 7pm Monday to Friday although works will continue through the weekends. The road should be clear by 17th September.